Subject of the Contract:
Design, build and operation of wastewater collection and treatment systems in rural areas of the north west of Iran (zone 4)
Employer: National Water and Wastewater Engineering Company
Consultant: Tarh and Tahghighat Consultant Engineers Company
Contractor: Joint Venture of Saabniroo - CGGC - Mahab Ghodss
Start of Project: year of 2017
Project location: 24 Villages in the Northwestern Provinces of Iran
Project Description:
- Design, implementation and operation of collection and treatment system of wastewater of 24 villages in the northwestern provinces of Iran
- 22 wastewater treatment with a total capacity of 11,650 cubic meters per day
- The treatment method of these treatment plants is generally SBR
- More than 310 km of transmission line and wastewater collection network under gravity and under pressure
- The material of pipes is double-walled polyethylene corrugated and single-walled in diameter of 110 to 400 mm.